ga_gprPE-62853-NONST-2027-000000029
Open
RFB 2027 - 04 - Noonday Creek Trail Connection at Dupree Road
WOODSTOCK, CITY OF · GA
- Response deadline
- Sep 22, 2026 Closed
- Date posted
- Aug 20, 2026
- Source
- Open notice
Description
The City of Woodstock, Georgia, herein referred to as the ¿City¿, is accepting bids from qualified contractors for the purpose of construction of a 10¿ trail connection from Dupree Road and to the Noonday Creek Trail. In order to construct the trail, the house at 132 Dupree Road will be demolished and hauled off, along with the three Driveways at 128, 130, 132 Dupree Rd, hereinafter referred to as the ¿project¿. This includes but is not limited to concrete sidewalk, stormwater drainage and Concrete ditch paving
Classifications
- NAICS91382
Documents (1)
- RFB 2027 _ 04 _ Noonday Creek Trail Connectio.pdfapplication/pdf4.3 MBNot yet available
Contacts
Similar contracts
- Upper L1 Ramp Concrete Repair at Fs1GADue Oct 16, 2026
- 2026-IFB-325 Midway Road Stormwater Improvement ProjectGADue Oct 7, 2026
- Fy27 Sidewalk Repair & ReplacementGADue Sep 17, 2026
- Bid No. 27003-2001, Union Park Pavilion Phase IIGADue Sep 14, 2026
- 2026-IFB-322 Donny Brook Lane Stormwater Improvement ProjectGADue Aug 5, 2026
- 26-055-Lh Jeffersonville Road Sidewalk Project (7/16/26)GADue Jul 16, 2026