Repair & Maintain Airfield Stormwater System Phase II
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
Classifications
Documents (5)
- DownloadDARB Stormwater PhII_Stamped Drawings_Certified Final P3.pdf.pdf30.0 MB
- DownloadDARB Stormwater PhII_Stamped Specifications_Publish_Feb 2026.pdf.pdf2.8 MB
- DownloadDARB Stormwater PhII_Stamped Drawings_Certified Final P1.pdf.pdf42.5 MB
- DownloadDARB Stormwater PhII_Stamped Drawings_Certified Final P2.pdf.pdf29.8 MB
- DownloadPre Solicitation Notice_Drainage 2026_updated_4.pdf.pdf175 KB
Contacts
- kevin.song@us.af.mil6786553695
- kenneth.jacob.1@us.af.mil6786555745
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026