Repair & Maintain Airfield Stormwater System Phase II
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
Classifications
Documents (1)
- DownloadPre Solicitation Notice_Drainage 2026_updated_5.pdf.pdf172 KB
Contacts
- kevin.song@us.af.mil6786553695
- kenneth.jacob.1@us.af.mil6786555745
Similar contracts
- Jennifer Brown (COW)WashingtonDue Oct 30, 2026
- 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, WyomingWyomingDue Nov 17, 2026
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesOklahomaDue Nov 19, 2026
- Atchison Storm Sewer Separation Improvements, Atchison, KansasDue Nov 13, 2026
- 658-23-108 Correct Stormwater DrainageVirginiaDue Nov 10, 2026
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesOklahomaDue Nov 19, 2026