ga_gprPE-48401-RFQC-2027-000000610
Open
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of th
- Response deadline
- Sep 4, 2026 Due in 2 days
- Date posted
- Jul 2, 2026
- Source
- Open notice
Description
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of the US 19/SR 9 Bridge over CSX Railroad #639817J along its existing alignment to meet current design standards, while spanning the existing CSX tracks and the Atlanta Beltline trail and accommodating a proposed future track expansion beneath the structure in Fulton County, Georgia (the Project). This Project will be awarded to a Construction Manager/General Contractor utilizing a One-Phase Best Value method. See the PNA for additional details.
Classifications
- NAICS92595
Documents (1)
- Download0016476_PNA_484_07022026_CMGC.pdfapplication/pdf311 KB
Contacts
- sr9atcsx@dot.ga.gov404-938-8950
Similar contracts
- RFP 2026-0022 Fuel Farm Electrical Feed to Emergency GeneratorGADue Jun 16, 2026
- PNA 484-081326 CEI US 278 Grade Separation over CSX RailroadGADue Oct 8, 2026
- RFQ-484-092826 On-Call Engineering Support Services for Cable Stayed Bridge and TunnelsGADue Sep 28, 2026
- GEORGIA PROCUREMENT REGISTRY UPLOAD The Georgia Department of Transportation advertisement for bids on various roadway and bridge projects of construction can bGADue Sep 18, 2026
- RFQ 484-090826 Government Estimator Contract Services (State Funded)GADue Sep 8, 2026
- PNA 484-100126 General Engineering Consulting (GEC) Services Regions 1&2GADue Sep 1, 2026