Osborne Park Re-Development_Phase 3 Improvements
- Response deadline
- Aug 6, 2026 Due in 19 days
- Date posted
- Jul 8, 2026
- Source
- Open notice
Description
PROJECT SUMMARY The Work generally consists of redevelopment improvements at Osborne Park including selective removal and earthwork; construction of new gravel pedestrian trails with ADA-related grading features; timber edging, retaining elements, exercise stations, drainage improvements, rain gardens, an infiltration basin, storm drainage structures, streambank restoration, trail lighting, landscaping, a fishing pier, and a prefabricated boardwalk with gangway, floating dock, and kayak launch. An additional prefabricated floating dock, with a kayak launch proposed as a separately bid additive alternate and is contingent on permitting approval. The compact scope above is intended for advertisement purposes only; the full scope, technical requirements, dimensions, materials, and incidental work are described in the Drawings, Specifications, and other Contract Documents.
Classifications
- NAICS98863
Documents (1)
- 00 11 00 Advertisement for Bids.pdfapplication/pdf125 KBNot yet available
Contacts
- Joe Byrnejbyrne@ctiengr.com770-742-6321