LIFT STATION REDESIGN B20128
- Response deadline
- Jul 17, 2026 Due in 0 days
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e. acid waste, chrome waste). Each Lift Station shall have the following features: • Two (2) electric pumps made of CPVC or 316 Stainless Steel. Pump fittings must be CPVC with a two (2) inch maximum nominal size. The pump flowrate should be 25 gallons per minute per pump. The pump must have a 30-foot total dynamic head. • The tank material shall be polypropylene, with a volume of 50 to 75 gallons and a single tank containment style. • The dimensions of the lift station shall be four (4) feet long, three (3) feet wide, and four (4) feet high. • The control panel enclosure shall be made of stainless steel. • The power supply shall be 120V or 208V. • Each pump shall have disconnect switches, hands-off-auto, and level sensors for automation on/off pump operation.
Classifications
Documents (8)
- DownloadSolicitation - FA857126Q0079.pdf.pdf528 KB
- DownloadWR-ALC Appendix C - BAF 78451 Lift Station Redesign B20128.pdf.pdf272 KB
- DownloadCDRL A001 - Commercial Drawings.pdf.pdf251 KB
- DownloadCDRL A005 - Accident Incident Report.pdf.pdf241 KB
- Download78451 - Purchase Description (PD) - Lift Station.pdf.pdf243 KB
- DownloadCDRL A003 - Status Report_EnMS Training.pdf.pdf240 KB
- DownloadCDRL A004 - Contractors Safety Plan.pdf.pdf240 KB
- DownloadCDRL A002 - Status Report_EMS Training.pdf.pdf240 KB
Contacts
- Phillip Braswell
- Andrew Harth