IFB/CS/DOA/2608-1270017/Central PC Air Replacement - Phase 2 at H-JAIA
- Response deadline
- Aug 24, 2026 Closed
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
The Central PC Air Replacement ¿ Phase 2 project will replace and modernize the aging centralized pre-conditioned air systems serving Concourses B and E at the airport. The work includes replacing major mechanical equipment, upgrading distribution piping and controls, improving supporting electrical, plumbing, fire protection, and life-safety systems, and expanding the infrastructure to support current and future aircraft gate configurations. Construction will occur primarily during overnight hours within the Aircraft Operations Area (AOA) and will require extensive coordination with the Department of Aviation and airline stakeholders to minimize disruptions to airport operations. All responses must be submitted electronically through the City of Atlanta's Supplier Portal (https://www.atlsuppliers.com/). Submissions made outside the Supplier Portal will not be accepted. To view solicitation details and submit a response, you must be a registered supplier and logged into the Portal. For supplier registration visit https://ehxr.fa.us2.oraclecloud.com/fscmUI/redwood/supplier-registration/register-supplier/register-supplier-verification
Classifications
- NAICS91017
Documents (1)
- 1270017_SUPPLIER.pdfapplication/pdf269 KBNot yet available
Contacts
- gtstratton@atlantaga.gov770-833-0184
Similar contracts
- 2026-20 Colonnade Chiller ReplacementGADue Oct 22, 2026
- RFB No. 27-0003 HVAC Preventive Maintenance & Repair ServicesGADue Sep 16, 2026
- Remote Energy Management Richmond State Supported Living CenterTXDue Sep 8, 2026
- RFP # 27-11, HVAC Maintenance and Repair - Annual ContractGADue Sep 16, 2026
- Mechanical Services for HVAC & Cooling SystemsGADue Aug 20, 2026
- HVAC Systems Services and Energy Management Austin State HospitalTXDue Aug 26, 2026