IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3
ATLANTA, CITY OF · GA
- Response deadline
- Aug 3, 2026 Due in 15 days
- Date posted
- Jul 2, 2026
- Source
- Open notice
Description
This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications.