FY 2027 Park Street Drainage Repair Project
- Response deadline
- Oct 14, 2026 Due in 32 days
- Date posted
- Sep 11, 2026
- Source
- Open notice
Description
1.Replacement of CMP culvert under Industrial Parkway a.Contractor will follow GDOT specifications to replace a damaged culvert under Industrial Pkwy. b.Contractor must use RCP and the culvert size will be increased to 30¿ c.Culvert will be placed on a minimum of 12¿ of foundation backfill. d.Culvert will receive GDOT Safety Flared End Sections e.Head and tail ditch to be excavated to match new culvert f.Culvert to be relocated 2¿ further away from the edge of Park Street. g.Culvert to be backfilled with 57 stone and or compacted GAB within 6¿ of finished grade. Final 6¿ to be paved, following GDOT 1401 detail. h.Industrial Pkwy may be closed to traffic during culvert replacement for up to 3days. i.City will assist with Walton EMC coordination. j.Contractor must call 811 and coordinate any other utility conflict resolutions. 2.Regrade and stabilize multiple ditch sections along Park Street (60¿ ROW) a.Contractor to excavate and/or fill eroded ditch sections along both sides of Park Street. All work to be inside of public right-of-way or with signed right-of-entry, acquired by the City. b.All areas to be stabilized at the end of each day with BMPs, which may include temporary cover and matting, ditch checks, or other erosion control BMPs. c.All ditches impacted must receive 2¿ flat bottom and appropriate side slopes, graded and compacted to minimize long-term erosion. d.All driveway culverts will be fully exposed and sedimentation removed. e.All Ditches to receive at least matting, grassing, and fertilization. If off-season or temporary grasses used, contractor will be required to regerminate warm-weather grass. f.Contractor will be responsible for the project until 85% stand of permanent grass. g.Sod matching adjacent yard will be utilized over any disturbed area greater than4¿ from the edge of the bottom of the ditch. h.Sod may be used in the ditch but must be staked. i.Approximate areas of particular concern are noted below but are not exhaustive.
Classifications
- NAICS91187
Documents (1)
- 2027 Walnut Grove Park Street Drainage Improv.pdfapplication/pdf571 KBNot yet available
Contacts
Similar contracts
- 2026-21 Newton Drive Storm Drainage Improvements ProjectGADue Oct 13, 2026
- Storm Drainage & Street Improvements to Serve S. Flowers DriveGADue Sep 10, 2026
- 2024 Guyton CDBG (PE24102)GADue Aug 19, 2026
- Acworth Due West - Ragsdale Road Multi-Use Trail ProjectGADue Aug 12, 2026
- RFB-PS-26-04 Mall Boulevard Stormwater ImprovementsGADue Aug 7, 2026