Civic AI
Civic AI
Procurement intelligence
SAM.govFA8532-26-R-B000
Open

EWAAC IDIQ FOPR_ MHU 196/204 A1 Power Control Unit Effort

DEPT OF DEFENSE · GA
Response deadline
Jun 30, 2026
Closed
Date posted
Jun 17, 2026

Description

Amendment 02 1. Due date for proposals is changed from 22 Jun 2026 to 30 Jun 2026 2. Updated Drawings added to requirement. Prospective contractors will be required to submit signed DD Form 2354 to review drawings. Amendment 01 1. This requirement is considered a supply withi some services. CLIN structure is outlined in the document named FOPR_MUH196204_PowerControlUnit. 2. Due date for proposals is changed from 15 Jun 2026 to 22 Jun 2026 ******** The requirement is to support a service life extension of existing legacy MHU-196/204 trailers that have been in service for 40 years. This will be a DO under the EWAAC contract.

Classifications

Documents (17)

  • Signed CDRL 002.pdf
    .pdf36 KB
    Download
  • Signed CDRL 001.pdf
    .pdf33 KB
    Download
  • Signed CDRL 004.pdf
    .pdf33 KB
    Download
  • SPI - FND165348L_A1 PN 60244-45100-10.pdf
    .pdf223 KB
    Download
  • afmc807.pdf
    .pdf155 KB
    Download
  • Signed CDRL 006.pdf
    .pdf33 KB
    Download
  • EN Drawing Package.pdf
    .pdf5.6 MBNot yet available
  • FOPR_MUH196204_PowerControlUnit_Amend02.pdf
    .pdf287 KB
    Download
  • Ship to locations A-1 Power Supply.xlsx
    .xlsx13 KB
    Download
  • Attachment 14 Additional Drawing Info.zip
    .zip6.0 MBNot yet available
  • afmc260.pdf
    .pdf54 KB
    Download
  • FOPR_MUH196204_PowerControlUnit_Amend01.pdf
    .pdf241 KB
    Download
  • Signed CDRL 005.pdf
    .pdf32 KB
    Download
  • FOPR_MUH196204_PowerControlUnit.pdf
    .pdf275 KB
    Download
  • SPI 60244-45200-10.pdf
    .pdf213 KB
    Download
  • Signed CDRL 003.pdf
    .pdf34 KB
    Download
  • MHU A1 Power SOW.docx
    .docx49 KB
    Download

Contacts

Explore more