Electric Capital Improvement Project South Oliver Line Rehabilitation Project
- Response deadline
- Dec 2, 2026 Due in 39 days
- Date posted
- Oct 23, 2026
- Source
- Open notice
Description
The City of Elberton intends to rehabilitate and reconstruct a section of its electric distribution system. The project consists of approximately 8,100 linear feet of three phase primary electrical distribution line. The scope of work includes, but is not limited to, the replacement of existing utility poles, the upgrading of existing primary conductors to a larger conductor size, and all associated labor, equipment, incidental materials not furnished by the City, and construction activities necessary to complete the project. The distribution line right-of way generally parallels State Highway 77 and Mineral Springs Road. All work shall be performed in accordance with the Electric Cities of Georgia (ECG) distribution construction standards or equivalent standards approved in writing by the City¿s Electric Distribution Manager, and in compliance with the National Electrical Safety Code, OSHA 29 CFR 1926 Subpart V, and 29 CFR 1910.269.
Classifications
- NAICS91115
Documents (2)
- Exhibit A _ Construction Contract _ South Oli.pdfapplication/pdf136 KBNot yet available
- Elberton South Oliver RFB.pdfapplication/pdf8.3 MBNot yet available
Contacts
- dseawright@cityofelberton.net706-213-3105
Similar contracts
- Storm Pipe RehabilitationGADue Sep 15, 2026
- SB007-27 Downtown Lawrenceville StreetscapeGADue Sep 3, 2026
- Douglas County Fleet Maintenance Generator ProjectGADue Aug 3, 2026
- Moody Water Plant chemical Room RehabGADue Jun 11, 2026
- 2026 Galvanized Main ReplacementGADue Jul 30, 2026
- 2026 T-SPLOST PavingGADue Jul 23, 2026