ga_gprPE-56300-RFP-2026-000000024
Open
Coffin Building Gym Floor Replacement
- Response deadline
- May 22, 2026 Closed
- Date posted
- Apr 20, 2026
- Source
- Open notice
Description
Demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, painting, and staining to match the existing artwork and color scheme.
Classifications
- NAICS91444
Documents
No documents posted for this opportunity.
Similar contracts
- BL115-26 Removal and Replacement of Epoxy Floors at Various Parks LocationsGADue Aug 21, 2026
- RFP-PELL-260000002205-1 — Carpet Removal ProjectMIDue Jul 1, 2026
- RFP-GARD-260000002158-1 — FLOORING PROJECTMIDue Jun 16, 2026
- RPQ-680-23-045/SS-7 — FLOORING SERVICES, PRE-QUALIFICATION OF VENDORSFLDue Jul 31, 2028