City of Hagan - Perkins Mill Estates RWFHI Project
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
The Scope of Work associated with the new Perkins Mill Estates shall generally include, but not be limited to, the following: (a) Rough grading ±6.32 acres of property including hauling of ±7,400 CY of compacted suitable material to establish subgrade for future development. (b) Installation of underground utilities. The installation of ±1,100 LF of 8 IN C900 water main pipe, hydrant assemblies, and water service locations. The installation of ±1,026 LF of SDR26 Gravity Sewer, 22 VF of 4¿ diameter precast Manholes, and 30 new lateral connections including piping. The installation of ± 24 LF of 18 IN Reinforced Concrete Pipe with Flared End Sections. (c) Grading and construction of a paved street, ±1,100 LF and 24 feet wide street, including ±3,178 SY of 6¿ graded aggregate base, and ±355 TN of 9.5 mm Superpave, including striping and final grading.
Classifications
- NAICS96185
Documents (2)
Contacts
- Rusty Lovettrul@robertscivilengineering.com912-278-1947