ga_gprPE-60855-NONST-2026-000000016
Open

City of Adairsville Water Plant Backwash Pump

Response deadline
Nov 3, 2026
Due in 42 days
Date posted
Sep 21, 2026

Description

The Project includes all material, labor, and related appurtenances for the purchase and installation of a 75Hp Backwash Pump at the existing Water Plant for use as an additional Water Plant Backwash Pump, providing redundancy at the facility. The Work also includes building a concrete pad for the pump and motor (with appropriate anchoring/dowelling to the existing concrete floor); the provision, install, and coordination of associated piping, fittings, and valves to connect to the existing Backwash System; addition of a check valve on existing backwash line; electrical wiring from the motor to the control panel (conduit pipe already in place); start up and testing of the system after installation; training for system use; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete, working, additional Backwash Pump at the Water Plant. SCADA system integration will be coordinated by Owner with their existing system integrator and paid for through the Allowance Item.

Classifications

Documents (1)

  • Water Plant Backwash Pump Advertisement For B.pdf
    application/pdf111 KBNot yet available

Contacts

Explore more