Canopy Group 2 - Cheatham Hill ES, East Side ES, Palmer MS, B27005
- Response deadline
- Sep 3, 2026 Due in 34 days
- Date posted
- Jul 30, 2026
- Source
- Open notice
Description
This project includes canopy work at three Cobb County School District locations, as outlined below: ¿ Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide. Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. ¿ East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide. Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80¿ in length by 10¿ wide. ¿ Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies ¿ please refer to the drawings.
Classifications
- NAICS90927
Documents
No documents posted for this opportunity.
Contacts
- wendy.bell@cobbk12.org770-426-3333
Similar contracts
- Canopy Group 1 - Argyle ES, Hollydale ES, Sanders ES, B27004GADue Sep 3, 2026
- McClure MS Roof Replacement, B27025GADue Sep 1, 2026
- RFP-BIS-260000002429-2 — BACC Foundation ProjectMIDue Aug 10, 2026
- Dodgen MS Renovations, B27001GADue Sep 2, 2026
- RFP-BIS-260000002429-1 — BACC Foundation ProjectMIDue Aug 10, 2026
- SSC - Northwest Victoria Demolition - Victoria, TX, Northwest Phase 2, #0236TXDue Aug 26, 2026