Civic AI
Civic AI
Procurement intelligence
ga_gprPE-61200-NONST-2026-000000008
Open

Bleckley Co. TIA Brodhead Road Phase I, II, & III

Response deadline
Sep 4, 2026
Due in 21 days
Date posted
Aug 13, 2026

Description

The Owner of the project is Bleckley County. The Engineer for the project is Andrew Johnson, PE of Construction Materials Services, Inc. Project Scope: This project as described herein and as shown on the project plan consists of two distinct sections of the same roadway, separated by Longstreet Road, with each having specific construction needs. Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part A: This section of the project consists of 0.20 miles of resurfacing beginning at GA SR 87 (Station #00+30.00) and ending at Station #11+28.00 and 1.64 miles of GRADE, DRAIN, BASE, PAVE (GDBP) construction beginning on Brodhead Road at existing edge of pavement (Station #11+28.00) and ending at Longstreet Road (Station #98+20.00). This section will require the full Typical section minus 6¿ of special subgrade. Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part B: This section of the project consists of 1.53 miles of grading and GDBP beginning at Longstreet Road (Station 98+40.00) and ending at SR 112 (Station #178+95.00). This section requires the full design Typical Section as shown on page C-1 of project plans.

Classifications

Documents (1)

  • ADVERTISEMENT FOR BIDDERS.pdf
    application/pdf209 KBNot yet available

Contacts

Similar contracts

Explore more