Bleckley Co. TIA Brodhead Road Phase I, II, & III
- Response deadline
- Sep 4, 2026 Due in 21 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
The Owner of the project is Bleckley County. The Engineer for the project is Andrew Johnson, PE of Construction Materials Services, Inc. Project Scope: This project as described herein and as shown on the project plan consists of two distinct sections of the same roadway, separated by Longstreet Road, with each having specific construction needs. Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part A: This section of the project consists of 0.20 miles of resurfacing beginning at GA SR 87 (Station #00+30.00) and ending at Station #11+28.00 and 1.64 miles of GRADE, DRAIN, BASE, PAVE (GDBP) construction beginning on Brodhead Road at existing edge of pavement (Station #11+28.00) and ending at Longstreet Road (Station #98+20.00). This section will require the full Typical section minus 6¿ of special subgrade. Broadhead Rd. (HG-Bleckley-001-003; GDOT PI #0018453, 0018454, 0018455) - Part B: This section of the project consists of 1.53 miles of grading and GDBP beginning at Longstreet Road (Station 98+40.00) and ending at SR 112 (Station #178+95.00). This section requires the full design Typical Section as shown on page C-1 of project plans.
Classifications
- NAICS75007
Documents (1)
- ADVERTISEMENT FOR BIDDERS.pdfapplication/pdf209 KBNot yet available
Contacts
- fdykes@bleckley.org478-934-3200
Similar contracts
- Bleckley Co. 2026 LRAGADue Jul 22, 2026