Civic AI
Civic AI
Procurement intelligence
ga_gprPE-66741-NONST-2027-000000017
Open

Alderman Lane and Parking Improvements (PE22217)

Response deadline
Dec 2, 2026
Due in 27 days
Date posted
Nov 4, 2026

Description

Sealed bids for construction of Alderman Lane and Parking Improvements will be received until December 2, 2026 at 2:00 PM at the Springfield City Hall at 130 South Laurel Street, Springfield, Georgia 31329 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: The project consists of approximately 3,170 SY of 6" GAB, asphalt milling, 12.5 mm asphalt paving, 300 SY of 6" concrete, 1,260 SY of seal coating, 440 LF of header curb, 90 concrete wheel stops, and 70 LF of 8" storm pipe. Also included are demolition, fencing and gate relocation, striping, traffic control, and grading complete. Time allotted for completion of work is one hundred twenty (120) calendar days. All Work shall be completed in accordance with the plans and specifications. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by the City of Springfield with SPLOST and TSPLOST funds. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project. Contractor shall comply with E-Verify regulations.

Classifications

Documents (1)

  • 00100_Advertisement to Bid_Alderman.pdf
    application/pdf350 KBNot yet available

Contacts

Similar contracts

Explore more