26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 8, 2026
- Source
- Open notice
Description
Fulton County, Georgia "County" This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran Mill Rd, that will convey flows to FPS. Both FPS and CRPS flows will be discharged to the Fulton County Cedar Grove Pump Station and to the Jones Road interceptor sewer where a tee, valve and manifold shall be installed for future connections. The invert Elevation at FPS will be set to allow the gravity system to enter from both northern and western sides of the wet well.
Classifications
- NAICS92597
Documents (1)
- 26RFP150795K_JAJ.pdfapplication/pdf875 KBNot yet available
Contacts
- james.jones@fultoncountyga.gov404-612-5818
Similar contracts
- A&E Services - Golden Shores Water Infrastructure & Lead RemMIDue Nov 13, 2026
- Request for Qualifications Annual Engineering ServicesGADue Nov 9, 2026
- Pre-Advertisement Notice for DWM Peachtree Raw Water Pump Station ProjectGADue Oct 30, 2026
- 2027 CDBG Engineering ServicesGADue Nov 5, 2026
- Utility Hydrogeologic Continuing Engineering ServicesFLDue Jul 9, 2026
- Utility Distr & Collect Syst Continuing Engineering ServicesFLDue Jul 8, 2026