2026 LMIG/LRA ROAD IMPROVEMENTS
- Response deadline
- Jun 15, 2026 Closed
- Date posted
- May 13, 2026
- Source
- Open notice
Description
This Project will repair and resurface approximately 10.7 miles on 7 roads in Mitchell County including County Line Road from the Thomas/Grady line to S.R. 93 (4.45 Miles), Orr Road from Forty-Niner Road to Old Pelham Camilla Road (1.64 Miles), Goodson Road from Harney Street to U.S. 19 (1.17 Miles), Mt, Zion Church Road from U.S. 19 to Mount Zion Road (3.16 Miles), Cut Road from S.R. 112 to S.R. 93 (0.28 Miles), patch a section on Delta Pine Road, and patch a section on Stage Coach Road. The scope generally consists of 2,170 TONS of Road Patching by milling existing road and replacing with 3-6¿ of 19 mm Superpave Asphalt, 5,670 TONS of leveling, 38,870 SY of Double Chip and Sand Seal Surface Treatment, and 6,263 TONS of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration along with any other related accessories and appurtenances as shown on the Drawings and called for in the Contract Documents.
Classifications
- NAICS91327
Documents
No documents posted for this opportunity.
Similar contracts
- FY 2026 TIA Resurfacing & Widening ProjectGADue Sep 24, 2026
- Concrete Pavement Repairs-Bar X-Phase IVTXDue Sep 22, 2026
- 2026-080-ITB Stewart Mill Road at Bermuda Road Roundabout (12 Months)GADue Oct 8, 2026
- LRA Patching, Milling and Resurfacing Various Roads in Douglas CountyGADue Sep 17, 2026
- STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INTERSECTION IMPROVEMENTTXDue Sep 2, 2026
- STATE LET CONSTRUCTION CONTRACT, WARD CO, FY 2027 SEAL COATTXDue Sep 2, 2026