ga_gprPE-67510-NONST-2026-000000032
Open
2026-180000-0601-HVAC Replacement
- Response deadline
- Jul 7, 2026 Closed
- Date posted
- Jun 1, 2026
- Source
- Open notice
Description
Description: The project involves comprehensive replacement and upgrade of the building¿s HVAC systems, including wall-hung and rooftop air conditioning units, furnaces, fan coil units, heat pumps, and ceiling-mounted water source heat pumps, with reuse of existing ductwork where feasible. Work also includes installation of new energy recovery units and a roof-mounted kitchen exhaust and make-up air system. The central plant will be fully replaced, including the cooling tower, heat exchanger, pumps, boilers, and associated piping, insulation, and accessories. Additional scope includes integrating all new equipment into the existing DDC controls system and modifying gas piping and electrical connections to support the new installations.
Classifications
- NAICS90927
Documents (1)
- Download2026_180000_0601_HVAC Replacement.pdfapplication/pdf471 KB
Contacts
- lynn.lewis@henry.k12.ga.us7709576601
Similar contracts
- 27-081126-64-AWGADue Sep 14, 2026
- 580 Glover Street HVAC Replacement, B27034GADue Sep 8, 2026
- Hardaway HS Rear Entry Drive UpgradeGADue Sep 22, 2026
- Lewis ES Renovations, B27006GADue Sep 2, 2026
- Powder Springs ES Renovations, B27007GADue Sep 1, 2026
- JEFFERSON PARKWAY ELEMENTARY RENOVATIONS PH3GADue Sep 1, 2026