FXSB 26-6837 Repair Replace Hangar Roof B11525
- Response deadline
- Jul 2, 2026 Closed
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
Site visit is scheduled for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- GAOA Remove and Replace Roofing on Island Park Admin Site Housing UnitsIdahoDue Oct 30, 2026
- Mosquito Lake Control Tower Structural Standing Seam Metal Roof ReplacementDue Oct 26, 2026
- Fenn Ranger Station roofing replacementIdahoDue Nov 5, 2026
- Roof RepairNorth CarolinaDue Nov 10, 2026
- Z--Slv-Cb Pumping Plant RoofColoradoDue Nov 2, 2026
- PRD B290 RoofNebraskaDue Oct 20, 2026