SAM.gov36C77626B0026
Open
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
VETERANS AFFAIRS, DEPARTMENT OF · Florida
- Response deadline
- Sep 8, 2026 Due in 15 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
Solicitation
Classifications
Documents (18)
- Site Visit Sign-in Sheet - Gainesville.pdf.pdf1.1 MBNot yet available
- Technical Questions Spreadsheet - Gainesville - 8-24-26.docx.docx680 KBNot yet available
- Attachment 2 - Drawings Volume 01.pdf.pdf33.9 MBNot yet available
- Attachment 6 - GNV EHRM - Phasing Plan - 260618.pdf.pdf101 KBNot yet available
- 36C77626B0026.pdf.pdf749 KBNot yet available
- Attachment 8 - VHA PCRA-1.1 - May 21 2024 -MAY-2026.pdf.pdf253 KBNot yet available
- 36C77626B0026 0001.pdf.pdf131 KBNot yet available
- Attachment 3 - Drawings Volume 02.pdf.pdf50.0 MBNot yet available
- Attachment 10 - Limitations on Subcontracting - Construction.docx.docx18 KBNot yet available
- Attachment 4 - Drawings Volume 03.pdf.pdf50.0 MBNot yet available
- Attachment 7 - VHA ICRA-1.4 - April 14 2026 - 0.pdf.pdf378 KBNot yet available
- Attachment 11 - Construction Wage Rates - Alachua - 05-18-26.pdf.pdf172 KBNot yet available
- Attachment 5 - Narrative.pdf.pdf4.7 MBNot yet available
- 36C77626B0026 0002.pdf.pdf173 KBNot yet available
- Attachment 1 - Specifications.pdf.pdf45.1 MBNot yet available
- Attachment 12 - Site Visit Instructions.pdf.pdf695 KBNot yet available
- Attachment 9 - Brand Name Justification - Redacted.pdf.pdf100 KBNot yet available
- 36C77626B0026 0003.pdf.pdf184 KBNot yet available
Contacts
- Contract Specialistshawn.tavernia@va.gov216-447-8321
- donald.marsh2@va.gov216-447-8321
Similar contracts
- Repair Outdoor Switchgear Cabinets, Beacon Hill, S-1459 at USAG HumphreysDue Sep 10, 2026
- Vault Door Replacement, Building 4215, 2DLAADNorth CarolinaDue Aug 25, 2026
- BUILDING LF-18 JFK RESTROOMS RENOVATIONDue Aug 31, 2026
- Misawa AB - Membrane Storage Shelters - Design-BuildAomoriDue Sep 11, 2026
- GAOA High Sierra Ranger Station Upgrades, Sierra National ForestCaliforniaDue Sep 23, 2026
- Building 36000 2nd Floor Reconfiguration to Conference SpaceTexasDue Sep 3, 2026