RFQ - CDDAR - Rapid Runway
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 20, 2026
- Source
- Open notice
Description
This is a request for quote (RFQ) for commercial products prepared in accordance with the streamlined simplified procedures in Revolutionary FAR Overhaul (RFO) Subpart 12.201-1, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Tyndall Air Force Base (TAFB) requires a rapidly deployable airfield matting solution to support dynamic flight operations across austere and varied terrains. The installation routinely hosts a wide range of aircraft, including high-performance fighters (F-35, F-16), E-9s, heavy cargo lifters (C-17), and transient commercial units. However, operational expansion and expeditionary exercises are often constrained by weak subgrades in the surrounding environment, such as loose dirt, mud, sand, and marshlands. To ensure continuous mission readiness and safe aircraft operations in these challenging conditions, TAFB requires an expeditionary "rapid runway" system. This system will provide a stabilized, high-load-bearing surface capable of supporting up to 400,000 lbs, enabling personnel to quickly establish, repair, or expand operational runways and taxiways as mission demands dictate. Please refer to the attached Statement of Work (SOW) and RFQ for detailed requirement description, instructions for submission, and method of evaluation.
Classifications
Documents (2)
- Rapid Runway - Salient Charecteristics.pdf.pdf69 KBNot yet available
- Solicitation - FA481926Q0084.pdf.pdf507 KBNot yet available
Contacts
- tyler.smith.113@us.af.mil8502838636
- karl.deffert.1@us.af.mil8502838668
Similar contracts
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=3c462fb17ce14ad199a7565c9555aaf0Due Nov 16, 2026
- Steering WheelDue Nov 2, 2026
- Rugged, Flat, PanelDue Oct 30, 2026
- Interface Unit, DataDue Nov 16, 2026
- Stop Ring, PackingDue Nov 16, 2026
- Xmitter, PrecsiontrmDue Nov 23, 2026