Physical Security System Maintenance
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Aug 4, 2026
- Source
- Open notice
Description
5th Amendment - Attached Updated RFI QA - 4th Amendment - The purpose of this amendment is to extend the offer date to the 12 August 2026 and to attach the Request for Information and Answers. Attachement: RFI QA 3rd Amendment - Offer date has been extended to the 31 July 2026. 2nd Amendment - Offer date has been extended to the 27 July 2026. 1st Amendment : The purpose of the amendment is to add FAR Clause 52.237-1 Site Visit and extend the response date to the 20 July 2026 @ 2pm CST. Amended Attachment: SF 20 dated 2 July 2026. The 325th Contracting Squadron at Tyndall AFB, is requesting maintenance, service, and support for the Lenel Access Control System (ACS), located at Eglin AFB FL, 53 Wing and 692 CYOS. IAW Statement of Work (SOW). Attachments: 1. Standard form 1449 2. SOW
Classifications
Documents (5)
- DownloadSOW 53WG bldg 351 Lenel Badging.pdf.pdf212 KB
- DownloadSolicitation Amendment FA481926Q00450001 SF 30.pdf.pdf509 KB
- DownloadRFI_QA FA481926Q0045 Phyical Security Sys_v2__53 WG_Consolidated_Response.docx.docx130 KB
- DownloadSolicitation - FA481926Q0045.pdf.pdf544 KB
- DownloadUpdated RFI QA FA481926Q0045 Phyical Security Sys 53 WG Consolidated Response.docx.docx130 KB
Contacts
- david.volberg@us.af.mil850-283-8615
- yvette.kelly@us.af.mil8502838619
Similar contracts
- CA-SNLNWRC-SECURITY ALARM & MONITORING FOR MULTIPLDue Aug 31, 2026
- (102) Vindicator MaintenanceMassachusettsDue Aug 24, 2026
- Fire Prevention and Protection Systems Maintenance and Repairs Service ContractDue Aug 26, 2026
- RFI - 37250PR260000091 - USCG Sector San Diego - FAA Regulated Hangar Fire System Testing, Certification, and Maintenance + Standard Fire Equipment and Systems Testing and CertificationCaliforniaDue Aug 22, 2026
- INDU FIRE SUPPRESSION SYSTEM INSPECTION SERVICEDue Sep 8, 2026
- Security Camera Installation Due Aug 25, 2026