Mobile Home Demolition
- Response deadline
- Sep 11, 2026 Due in 9 days
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases: Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel. Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility. Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear. 4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB) Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil Site Visit Date: 09 September 2026 Time: 10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil (904) 823-0555 ***Attendance is not required and will not prohibit quote submissions.***
Classifications
Documents (3)
- SCA Wage Determination_2015-4539.pdf.pdf4.1 MBNot yet available
- Solicitation - W911YN26QA024.pdf.pdf3.1 MBNot yet available
- PWS_Demo.pdf.pdf2.7 MBNot yet available
Contacts
Similar contracts
- Erosion Control for building 2276CaliforniaDue Sep 11, 2026
- Demo w/ Abatement B5907 Camp BullisTexasDue Sep 4, 2026
- DBEH 25-1628_Demolition Indefinite Delivery Indefinite QuantityFloridaDue Sep 8, 2026
- MMD and HAHD Woody Debris Chipping Service (Equipment w/ Operator)WashingtonDue Sep 8, 2026
- Y--Datil Well CG Double Vault Toilet Socorro (SFO)New MexicoDue Sep 9, 2026
- ACC002 Utilities and InfrastructureDue Sep 9, 2026