Mechanical Site Prep – Drum Chopping
- Response deadline
- Oct 28, 2026 Due in 18 days
- Date posted
- Oct 9, 2026
- Source
- Open notice
Description
This requirement is for Mechanical Site Preparation using a double drum chopper on the Ocala National Forest. Work includes single and double chopping treatments to prepare timber harvest areas and support vegetation management objectives. Contractors must provide all equipment, labor, supervision, transportation, and materials needed to meet performance standards, including the ability to chop approximately 50 acres per day. Equipment must meet specified weight, speed, and blade requirements, and the Government may require replacement of unsatisfactory equipment. Treatment includes chopping vegetation up to 6 inches in diameter, leaving designated snags, and incorporating “sloppy chop” exclusion zones. Roads within treatment areas not shown on maps must also be chopped. Please review the attached Statement of Work for full specifications and requirements.
Classifications
Documents (5)
- C04-Attachment 2_Mech Site Prep Drum Chopping_SOW.pdf.pdf13.3 MBNot yet available
- C04-Attachment 4-12444726Q0069 WD.pdf.pdf28 KBNot yet available
- C04 12444726Q0069 SAM RFQ.pdf.pdf390 KBNot yet available
- C04-Attachment 1-12444726Q0069 SOI.xlsx.xlsx11 KBNot yet available
- C04-Attachment 3 FY26_Maps_Drum Chopping.pdf.pdf1.0 MBNot yet available
Contacts
Similar contracts
- Longleaf Timber Stand ImprovementFloridaDue Oct 27, 2026
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=6849d182e4f14dc7814e6abebbb7e18aTexasDue Oct 24, 2026
- Green Mountain Finger Lakes Invasive Species Map and ControlVermontDue Oct 27, 2026
- Green Mountain Finger Lakes Invasive Species Map and ControlVermontDue Oct 27, 2026
- Sierra National Forest (SNF5) Coyote Fuels Reduction and Site PreparationCaliforniaDue Oct 16, 2026
- Sierra National Forest (SNF5) Coyote Fuels Reduction and Site PreparationCaliforniaDue Oct 9, 2026