Civic AI
Civic AI
Procurement intelligence
SAM.gov12639526Q0232
Open

Building 63 Envelope and HVAC Renovation, Coral Gables

Response deadline
Aug 19, 2026
Due in 3 days
Date posted
Aug 4, 2026

Description

The facility located at the USDA Subtropical Horticulture Research Agricultural Research Service (ARS) Station has approximately 6,000 square feet of lab and office area. The ductwork is collecting condensation and causing water damage. The HVAC system consists of one air-cooled chiller, associated pumps, and two variable air volume air handling units. The humidity in the labs was tested and determined to be higher than the acceptable range (70% or higher). A&E firm Clark Nexsen provided retro commissioning with TAB services and proposed solutions for the condensation problem, as well as designs for the renovation of the roof, HVAC, BAS, and chiller. Solicitation documents are posted below. NOTE: The drawings and specifications below are the A&E's 100% submittal to USDA-APHIS. When internal reviews are complete and returned, the A&E will finalize and send us the stamped, for-construction drawings and specs, at which point they'll be posted here. Amendment 1 and the final construction documents are posted below. Site visit attendance list is posted below.

Classifications

Documents (9)

  • Final Specifications.pdf
    .pdf5.0 MB
    Download
  • Attachment 4_Federal Construction Wage Rates_Miami-Dade County.txt
    .txt15 KB
    Download
  • 12639526Q0232-0001.pdf
    .pdf467 KB
    Download
  • Attachment 2_Drawings.pdf
    .pdf15.1 MB
    Download
  • Site visit attendance.pdf
    .pdf1.4 MB
    Download
  • Final Drawings.pdf
    .pdf18.1 MB
    Download
  • Attachment 3_Specifications.pdf
    .pdf3.5 MB
    Download
  • Attachment 1_Statement of Work.doc
    .doc110 KB
    Download
  • 12639526Q0232.docx
    .docx78 KB
    Download

Contacts

Similar contracts

Explore more