AFNORTH Carpet Replacement
- Response deadline
- Sep 7, 2026 Due in 14 days
- Date posted
- Aug 25, 2026
- Source
- Open notice
Description
Solicitation Amendment FA481926QA0610001: The purpose of this amendment is to make the following changes: Wage Determination Update: Attachment 7, Wage Determination Revision 33, dated 30 July 2026, is hereby removed and replaced with Attachment 7, Wage Determination 2015-4559, Revision 34, dated 17 August 2026, which is attached and incorporated herein. Removal of Technical Submission Requirement: The requirement stated in section C, Instructions to Offerors, paragraph (2) Volume 2 – Technical Approach, subparagraph a. Qualifications and Certifications is hereby deleted in its entirety. Offerors are no longer required to provide written proof of manufacturer-approved installer status. Removal of Evaluation Criterion: The evaluation factor stated in section D, Evaluation Criteria, paragraph (b) Evaluation Process, Step 1: Technical Acceptability, item 1. Qualifications and Certifications is hereby deleted in its entirety. All other terms and conditions of the document remain the same. The contractor shall accomplish the complete removal and disposal of existing flooring, prep all surfaces, and install new flooring in designated offices of the AFNORTH building located on Tyndall Air Force Base, FL, in accordance with the attached Statement of Work (SOW). The successful offeror must complete all work within 90 calendar days from the date of contract award. Effective 18 January 2023, all carpet procurement and installation services at Air Force CONUS installations must comply with the Mandatory Air Force Carpet II Program. Contractors (Tier II) must contact one of the seven (7) awarded Tier I Carpet Manufacturers to obtain material quotes using the Air Force Carpet Program Ordering Guide. This program strictly governs modular carpet tiles, roll goods, walk-off tiles, and approved adhesives. The physical installation will be managed and executed by local contractors. Contractor mark-ups or profit are not allowable on the actual material costs purchased via the Tier I contracts; therefore, the proposal submission must break down costs utilizing the mandatory CLIN structure outlined in the solicitation package. A site visit is scheduled for 19 August 2026 at 10:00 AM CST at the AFNORTH building. While attendance is not mandatory, it is highly recommended. For Personnel WITHOUT Base Access: Please arrive at the Tyndall Air Force Base Visitor’s Center no later than 09:30 AM CST on the day of the site visit. Please email candace.robinson.1@us.af.mil and shawna.morris.2@us.af.mil the completed Attachment 9 Base Access Request EAL form no later than 18 August 2026 at 12:00 PM CST to ensure accurate accounting of personnel. For Personnel WITH Base Access: Please meet no later than 09:45 AM CST at the gazebo located on the north side of the AFNORTH building. Important Deadlines: Site Visit: Scheduled for 19 August 2026 at 10:00 AM CST at the AFNORTH building. Questions Due: Technical and administrative inquiries must be submitted no later than 21 August 2026 at 1:00 PM CST. Questions received after this cutoff will not be answered. All questions and answers will be consolidated and publicly posted to SAM.gov. Quotes Due: Final proposal packages must be submitted to candace.robinson.1@us.af.mil and shawna.morris.2@us.af.mil by 7 September 2026 no later than 09:00 AM CST. All interested parties are encouraged to review the attached solicitation and SOW and respond accordingly.
Classifications
Documents (11)
- Attachment 4 - Contracted Tier I Carpet Vendors.pdf.pdf63 KBNot yet available
- Attachment 8 - USAF Carpet II Program Ordering Guide (Jan 23).pdf.pdf220 KBNot yet available
- Attachment 7 - Wage Determination 2015-4559 Rev 34 17 Aug 2026.pdf.pdf473 KBNot yet available
- RFQ - FA481926QA0610001.pdf.pdf533 KBNot yet available
- RFQ - FA481926QA061.pdf.pdf247 KBNot yet available
- Attachment 1 - Tyndall AFB IMT Forms 81 82 and 83.pdf.pdf241 KBNot yet available
- Attachment 3 - Question Worksheet.xlsx.xlsx18 KBNot yet available
- Attachment 2 - Layout Drawing.pdf.pdf466 KBNot yet available
- Attachment 9 - Base Access Request EAL.xlsx.xlsx19 KBNot yet available
- Attachment 5 - Applicable Clauses and Provisions.pdf.pdf60 KBNot yet available
- Attachment 6 - Statement of Work - AFNORTH Carpet.pdf.pdf1.1 MBNot yet available
Contacts
Similar contracts
- Patrick SFB Carpet ReplacementFloridaDue Sep 4, 2026
- McConnell AFB - Carpet Replacement (B739, B840, B955)KansasDue Sep 11, 2026
- Multi-Building Carpet & LVPSouth CarolinaDue Sep 7, 2026
- carpetDue Aug 27, 2026
- Purchase of Carpet TileCaliforniaDue Aug 19, 2026
- SLD 30/SE, B7015, Carpet Removal/InstallationCaliforniaDue Sep 1, 2026