Civic AI
Civic AI
Procurement intelligence
SAM.govFA481926QA061
Open

AFNORTH Carpet Replacement

DEPT OF DEFENSE · Florida
Response deadline
Sep 7, 2026
Due in 27 days
Date posted
Aug 11, 2026

Description

The contractor shall accomplish the complete removal and disposal of existing flooring, prep all surfaces, and install new flooring in designated offices of the AFNORTH building located on Tyndall Air Force Base, FL, in accordance with the attached Statement of Work (SOW). The successful offeror must complete all work within 90 calendar days from the date of contract award. Effective 18 January 2023, all carpet procurement and installation services at Air Force CONUS installations must comply with the Mandatory Air Force Carpet II Program. Contractors (Tier II) must contact one of the seven (7) awarded Tier I Carpet Manufacturers to obtain material quotes using the Air Force Carpet Program Ordering Guide. This program strictly governs modular carpet tiles, roll goods, walk-off tiles, and approved adhesives. The physical installation will be managed and executed by local contractors. Contractor mark-ups or profit are not allowable on the actual material costs purchased via the Tier I contracts; therefore, the proposal submission must break down costs utilizing the mandatory CLIN structure outlined in the solicitation package. A site visit is scheduled for 19 August 2026 at 10:00 AM CST at the AFNORTH building. While attendance is not mandatory, it is highly recommended. For Personnel WITHOUT Base Access: Please arrive at the Tyndall Air Force Base Visitor’s Center no later than 09:30 AM CST on the day of the site visit. Please email candace.robinson.1@us.af.mil and shawna.morris.2@us.af.mil the completed Attachment 9 Base Access Request EAL form no later than 18 August 2026 at 12:00 PM CST to ensure accurate accounting of personnel. For Personnel WITH Base Access: Please meet no later than 09:45 AM CST at the gazebo located on the north side of the AFNORTH building. Important Deadlines: Site Visit: Scheduled for 19 August 2026 at 10:00 AM CST at the AFNORTH building. Questions Due: Technical and administrative inquiries must be submitted no later than 21 August 2026 at 1:00 PM CST. Questions received after this cutoff will not be answered. All questions and answers will be consolidated and publicly posted to SAM.gov. Quotes Due: Final proposal packages must be submitted to candace.robinson.1@us.af.mil and shawna.morris.2@us.af.mil by 7 September 2026 no later than 09:00 AM CST. All interested parties are encouraged to review the attached solicitation and SOW and respond accordingly.

Classifications

Documents (10)

  • Attachment 4 - Contracted Tier I Carpet Vendors.pdf
    .pdf63 KB
    Download
  • Attachment 8 - USAF Carpet II Program Ordering Guide (Jan 23).pdf
    .pdf220 KB
    Download
  • Attachment 7 - Wage Determination - 30 July 2026_Rev 33.pdf
    .pdf251 KB
    Download
  • RFQ - FA481926QA061.pdf
    .pdf247 KB
    Download
  • Attachment 1 - Tyndall AFB IMT Forms 81 82 and 83.pdf
    .pdf241 KB
    Download
  • Attachment 3 - Question Worksheet.xlsx
    .xlsx18 KB
    Download
  • Attachment 2 - Layout Drawing.pdf
    .pdf466 KB
    Download
  • Attachment 9 - Base Access Request EAL.xlsx
    .xlsx19 KB
    Download
  • Attachment 5 - Applicable Clauses and Provisions.pdf
    .pdf60 KB
    Download
  • Attachment 6 - Statement of Work - AFNORTH Carpet.pdf
    .pdf1.1 MB
    Download

Contacts

Similar contracts

Explore more