Western Way Interim Improvements
- Response deadline
- Jun 18, 2026 Closed
- Date posted
- May 19, 2026
- Source
- Open notice
Description
The scope of work for the Western Way Interim Improvements includes but is not limited to: • maintenance of traffic • temporary traffic control • lane closures • milling and resurfacing of existing asphalt pavement • removal of existing concrete traffic separator • hydro blasting (bridge deck) • final pavement marking and striping • regulatory sign installation and relocation • removal and replacement of themed wayfinding signs • relocation of existing signal heads • installation of new signal heads • installation of new median turn lane signal pedestals and bases and associated conduit • pull boxes • traffic control cabinet tie-in work; • erosion control; and • site restoration Location is at Buena Vista Drive and Western Way, with additional work along the northbound approach of Hartzog Road. The project consists of milling existing asphalt pavement to a depth of 1.5 inches and placing new 1.5-inch FC-12.5 including hydro blasting (bridge deck), and final striping on Buena Vista Drive and Western Way, along with localized striping modifications on Hartzog Road. Construction activities are phased to maintain existing traffic circulation and ensure public safety through temporary lane closures and MOT operations.
Classifications
- NAICS55121710
Documents
No documents posted for this opportunity.
Similar contracts
- Traffic Management Maintenance - Continuing ServicesFLDue Jul 7, 2026
- Traffic Control Signs and MaterialsCTDue Jul 2, 2026