Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
- Response deadline
- Nov 19, 2026 Due in 30 days
- Date posted
- Oct 19, 2026
- Source
- Open notice
Description
Notice is hereby given that City of Orlando is accepting sealed responses for Project ID Project Title and they must be submitted electronically by 2:00 pm local time on Proposal Submission Date , in order for a Respondent to be considered for award of a contract. Respondents are solely responsible for ensuring that their submittals are complete, uploaded, and submitted electronically via OpenGov by the due date and time. The City shall not be responsible for any submission delays or failures caused by any occurrence. Respondents are expected to examine this solicitation, specifications, associated drawings, if any, and all instructions. Failure to do so will be at the Respondent's risk. Each Respondent shall furnish the information required on each submittal form and each accompanying sheet thereof on which an entry is made.
Documents
No documents posted for this opportunity.
Similar contracts
- Design Services for Orlando Flood Mitigation by Drainwell Replacement (Block Grant)FLDue Oct 14, 2026
- Soil Stabilization Pressure Grouting at 3814 Winderlakes Drive/Florida’s TurnpikeFLDue Oct 22, 2026
- Design-Build Services at Grove Park GarageFLDue Sep 4, 2026
- Design Services for Orlando Flood Mitigation by Drainwell Replacement (Block Grant)FLDue Sep 3, 2026
- Water Conserv II WRF Equalization Pump Station ImprovementsFLDue Aug 20, 2026
- Construction, Engineering, and Inspection Services For The Canopy ProjectFLDue Jul 30, 2026