U.S. Highway 27 Water Main Replacement
- Response deadline
- Jul 22, 2026 Due in 3 days
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
The City of Leesburg seeks to secure the services of a qualified, Florida-licensed Certified Contractor to provide all necessary labor, equipment, tools, materials, supplies, and incidentals to replace 5.5 miles of existing 10-inch water main pipe with 12-inch C900 pipe along U.S. Highway 27, from Middlesex Road to Highland Lake Boulevard (Phase 1). Work will also include the installation of additional fire hydrants, valves, fittings, and appurtenances. Any fencing, structures, or private property disturbed during the construction must be restored to their original condition upon completion of the project (Phase 2). Contractor shall follow the engineering design plans provided by the City and perform all work in accordance with the specifications associated with this solicitation.
Documents
No documents posted for this opportunity.