T4745
- Response deadline
- Jul 29, 2026 Due in 3 days
- Date posted
- May 29, 2026
- Source
- Open notice
Description
LETTING LOCATION: Contracts Administration Office POSTING DATES: 08/12/2026 and 08/26/2026 CONTRACT DAYS: 242 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days The Improvements under this Contract consist of , but are not limited to, MOT (standard, Arrow Board, PCMS), protections (sediment, inlet), concrete (removal, curb and gutter, traffic separator, sidewalk, driveways, ditch pavement, barrier wall), base (widening), asphalt (widening, milling, resurfacing), drainage (manhole adjust, structures), signing (single-column, panel, overhead sign structure), pavement markings (RPM, painted, thermoplastic), signalization (pedestrian pedestals, conduit, pull/splice box, cable distribution, aluminum signal poles complete), electrical service (power, wire), Lighting (light pole complete, luminaire retrofit) and sod along State Road 882 (Forest Hill Boulevard) from east of Lake Clarke Drive to US-1 (Dixie Highway) for 1.077 miles in the City of Lake Clarke Shores and the City of West Palm Beach, Palm Beach County. Counties: PALM BEACH Highway: 9322 Eligibility: Eligible
Documents
No documents posted for this opportunity.