Stationary Nitrogen Generator System
- Response deadline
- Jul 27, 2026 Closed
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
1. Objective & Scope The Florida Air National Guard has a requirement for the procurement, delivery, and initial commissioning of one (1) new Stationary Nitrogen Generator System. The purpose of this equipment is to provide a reliable, on-site, continuous supply of high-purity nitrogen gas to support aircraft tire service. Procuring this system will eliminate the logistical overhead, costs, and safety hazards associated with handling recurring high-pressure cylinder deliveries. 2. Salient Characteristics (Minimum Specifications) Please see the attached Solicitation for Salient Characteristics. 3. Delivery, Installation, and Training Delivery Terms: FOB Destination to 125th FW Installation/Commissioning: The contractor shall provide all labor, tools, and materials necessary to uncrate, assemble, and commission the unit. Training: The contractor must provide on-site operation and basic preventative maintenance training for government personnel upon successful commissioning. 4. Warranty and Documentation The system must include a standard commercial warranty of at least one (1) year covering parts and labor against manufacturing defects. The vendor must provide complete Operation and Maintenance (O&M) manuals in English (both digital and physical copies upon delivery).
Classifications
Documents (5)
- Solicitation Amendment W50S6Y26QA0170002 SF 30.pdf.pdf3.7 MBNot yet available
- Description of Supply Rev 1.docx.docx16 KBNot yet available
- Solicitation - W50S6Y26QA017 Nitrogen Generator System.pdf.pdf1.3 MBNot yet available
- Solicitation Amendment W50S6Y26QA0170001 SF 30.pdf.pdf3.7 MBNot yet available
- RFI Log - 26QA017- Contractor - Nitrogen Generatorv.2.xlsx.xlsx12 KBNot yet available
Contacts
- jonathan.acree@us.af.mil9047417441
- overton.spence.2@us.af.mil904-741-7442
Similar contracts
- 61--WEDGE,HOLDINGDue Aug 24, 2026
- 59--RESOLVER,ELECTRICALDue Aug 27, 2026
- 61--MOTOR,ALTERNATING CDue Aug 27, 2026
- 61--MOTOR,ALTERNATING CURRDue Aug 24, 2026
- 61--MOTOR,DIRECT CURRENTDue Aug 24, 2026
- 61--MOTOR,DIRECT CURRENTDue Aug 27, 2026