SRF Water System Upgrades
- Response deadline
- Sep 3, 2026 Due in 18 days
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
BASE BID - Remove and replace two Jockey and three High Service (HS) Pumps to increase available service pressure to Magnolia Point. Revised design points are summarized as follows: • Jockey Pumps: 400 gpm @ 196 ft (TDH) | 85 psig • HS Pumps: 1,200 gpm @ 196 ft (TDH) | 85 psig - Magnolia Point Loop Control Station 1 and Station 2 valving modifications to remove existing hydraulic control valves with motor-operated butterfly valves. - Harbor Road Elevated Storage Tank (EST) hydraulic altitude valve removal and replacement with motor operated butterfly valves. - Associated electrical and instrumentation improvements. - Bonaventure EST Improvements: Hydraulic altitude valve removal and replacement with motoroperated butterfly valves. ADDITIVE ALTERNATE 1 - Harbor Road WTP and Magnolia Point Control Valve Improvements: Construct 200,000-gallon Ground Storage Tank 3 (GST 3) with conventional tray aerator to increase the storage capacity to 600,000 gallons. ADDITIVE ALTERNATE 2 - Construct two 10,000-gallon hydropneumatic tanks (Hydro Tanks) with air compressor.
Documents
No documents posted for this opportunity.
Similar contracts
- SRF Pine Ave Force Main ExtensionFLDue Sep 3, 2026