Civic AI
Civic AI
Procurement intelligence
OpenGov / Ionwave2026-04
Open

SRF Water System Upgrades

Response deadline
Sep 3, 2026
Due in 18 days
Date posted
Jul 22, 2026

Description

BASE BID - Remove and replace two Jockey and three High Service (HS) Pumps to increase available service pressure to Magnolia Point. Revised design points are summarized as follows: • Jockey Pumps: 400 gpm @ 196 ft (TDH) | 85 psig • HS Pumps: 1,200 gpm @ 196 ft (TDH) | 85 psig - Magnolia Point Loop Control Station 1 and Station 2 valving modifications to remove existing hydraulic control valves with motor-operated butterfly valves. - Harbor Road Elevated Storage Tank (EST) hydraulic altitude valve removal and replacement with motor operated butterfly valves. - Associated electrical and instrumentation improvements. - Bonaventure EST Improvements: Hydraulic altitude valve removal and replacement with motoroperated butterfly valves. ADDITIVE ALTERNATE 1 - Harbor Road WTP and Magnolia Point Control Valve Improvements: Construct 200,000-gallon Ground Storage Tank 3 (GST 3) with conventional tray aerator to increase the storage capacity to 600,000 gallons. ADDITIVE ALTERNATE 2 - Construct two 10,000-gallon hydropneumatic tanks (Hydro Tanks) with air compressor.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more