Silver Ridge Water Main Replacement
- Response deadline
- Nov 10, 2026 Due in 32 days
- Date posted
- Oct 8, 2026
- Source
- Open notice
Description
The City of Edgewater is soliciting sealed bids from qualified contractors to provide construction services for the Silver Ridge Water Main Replacement. This project is a critical infrastructure improvement designed to replace aging potable water infrastructure and improve system reliability, pressure, and redundancy within the Silver Ridge service area. This project consists of a replacement of an existing 2-inch galvanized iron potable water main along Lee Drive and Denson Drive with a new 3-inch DR-11 PE Water Main at Silver Circle replacing the existing water main along Lee Drive via installation of 1,090 linear feet of 3-inch DR-11 PE open-cut water main and 150 linear feet of 3-inch horizontal directionally drilled DR-11 PE water main. The new main will connect to the existing 6-inch water main at Silver Circle and extend along Lee Drive. It will also tie into the existing 6-inch asbestos cement water main along Silver Circle, connecting to the proposed main along Lee Drive. Additionally, a loop in the water main is proposed by directional drilling approximately 180 linear feet of 8-inch DR-11 PE 4710 water main from Silver Circle to Glenwood drive connecting via two tapping sleeves and valves.
Documents
No documents posted for this opportunity.
Similar contracts
- SUNTrail North Segment from S.R. 442 to Dale StreetFLDue Jul 9, 2026