Serenola Substation Fence Phase 1
- Response deadline
- Aug 10, 2026 Due in 15 days
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
GRU is soliciting bids for the installation of approximately 600 linear feet of commercial-grade, black vinyl-coated chain link fencing along the north property line of the Serenola substation. This project includes the installation of a 14-foot wide double gate system at the north corner of the property, located within the utility right-of-way, where it will function alongside an existing vehicle gate and connect to the current fencing behind the adjacent apartment complex. The primary goal is to significantly enhance site security while maintaining an aesthetically pleasing appearance that complements the neighboring hotel property. By selecting a high-quality, black vinyl-coated system, we ensure the necessary durability for utility infrastructure while achieving a low-profile, professional look that minimizes the industrial impact of the site.
Documents
No documents posted for this opportunity.