S-40 Erosion Repairs
- Response deadline
- Oct 20, 2026 Due in 28 days
- Date posted
- Sep 21, 2026
- Source
- Open notice
Description
A Mandatory Pre-Bid Meeting will be conducted via Microsoft Teams on 09/24/2026 at 10:00 AM. The Teams meeting link and access information are provided below: https://teams.microsoft.com/meet/296835092559211?p=AD8O0x3Ssfdqjb33GI We are pleased to invite you to participate on Bid #C007123 S-40 Erosion Repairs. The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: BID LINK HERE. The scope of work for the S-40 Water Control Structure Repairs Project includes, but is not limited to: maintenance of Traffic, Erosion and Turbidity Control, Site Access and Staging, Survey Control, Debris Removal, Steel Sheet Pile Installation, Void Filling beneath the Existing Downstream Apron, Riprap Installation, Bank and Canal Slope Stabilization, Site Restoration, and As-Built Documentation. The Contractor shall furnish all labor, materials, equipment, supervision, surveying, diving support, temporary controls, permits, disposal, testing, and incidentals necessary to provide a complete project.
Classifications
- NAICS70131503
Documents (1)
- C007123 MFMP Bid Flyer.pdfapplication/pdf441 KBNot yet available
Contacts
- dager@oversightdistrict.org(407) 371-4963
Similar contracts
- 2027 Milling and Resurfacing ProjectFLDue Oct 20, 2026
- HVAC Chiller Overhauls- CHOT & NSCEP locationsFLDue Sep 30, 2026
- Mowing and Weed Control Services- Rapid Infiltration BasinsFLDue Sep 24, 2026
- Rapid Infiltration Basins (RIBS) Rehabilitation: Three-Year PhasingFLDue Oct 1, 2026
- Lift Station #46 RehabilitationFLDue Oct 5, 2026
- Modeling Of The Epcot Energy Plant Electrical SystemFLDue Sep 18, 2026