SAM.govFA2521-19-B-0001
Open
Replace Lift Station 725, PAFB FL
DEPT OF DEFENSE · FL
- Response deadline
- —
- Date posted
- Dec 6, 2018
- Source
- Open notice
Description
The contracting officer has reason to believe that the bids of an important segment of bidders have been delayed in the communications system specified for transmission of bids, specifically 45conslgcaebids@us.af.mil. Therefore, in accordance with (IAW) FAR 14-402-3, the bid opening has been postponed until 13 Dec 18. See Block 14 continuation on page 2 for specific details on the re-submission of e-bids. Please refer to Solicitation FA2521-19-B-0001_01 (Amendment 1) for further details on bid submission instructions.
Classifications
Documents (19)
- DownloadFA252119B0001.pdf.pdf502 KB
- DownloadAttach_9_Site_Visit_Badge_Request.pdf.pdf54 KB
- DownloadAtch1RuleofEngagement.pdf.pdf113 KB
- DownloadAttach_8_Visit_Rules_of_Engangement.pdf.pdf113 KB
- DownloadAttach_4_DBWD_FL180001.pdf.pdf49 KB
- DownloadAtch2BadgeRequest.pdf.pdf54 KB
- DownloadAttach_3_Statement_of_Work.docx.docx19 KB
- DownloadConsolidated_Q&_A_-_Answers.pdf.pdf112 KB
- DownloadAttach_3_C102_As-built.pdf.pdf218 KB
- DownloadAttach_2_Area_7_Map.pdf.pdf884 KB
- DownloadAttach_1_SXHT_16-1100_Drawings.pdf.pdf3.0 MB
- DownloadAttach_5_GPP_Certification.pdf.pdf231 KB
- DownloadAttach_6_HAZWaste_Form.doc.doc40 KB
- DownloadAttach_7_Q_&_A_Template.doc.doc26 KB
- DownloadFA2521-19-B-0001_01_(Amendment_1).pdf.pdf771 KB
- DownloadAttach_2_SXHT_16-1100_Specs.pdf.pdf945 KB
- DownloadAtch3Q&A.doc.doc26 KB
- DownloadAttach_1_Area_6_Map.pdf.pdf936 KB
- DownloadAttendees_List_-_Copy_Redacted.pdf.pdf1.3 MB
Contacts
- Contract Specialistrosita.serrano.1@us.af.mil321-494-5231
- Contracting Officerkimberly.horner@us.af.mil3214940447
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026