Premise wire - Solicitation
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- Jun 2, 2026
- Source
- Open notice
Description
NOTE: There will be a site visit conducted on June 10, 2026 at 10am CDT. EAL is due NLT 1300 CDT on June 6, 2026. If you already have access to Tyndall Air Force Base an EAL is not required. Attachment L contains the information for when questions are due by. The Contractor to engineer, furnish, install and test (EFI&T) premise wiring within building 549 at Tyndall AFB. Newly installed premise wiring will support Unclassified but Sensitive Internet Protocol Router Network (NIPRNet). The Contractor shall provide all materials, transportation, labor, management, tools, and other incidentals necessary to meet the requirements. All materials provided shall be new and not refurbished. The Contractor must identify any base support requirements (for example, laydown and storage areas) necessary to complete this project. The Contractor shall coordinate with 325CS for storage space and staging area requirements. The Contractor shall restore all disturbed grounds/base property to the "as found" condition or better after installation. Base grounds/property restoration requirements shall be complied with.
Classifications
Documents (5)
Contacts
- angel.clarke@us.af.mil8502838673
- david.volberg@us.af.mil8502838615
Similar contracts
- Micro Gin Motor Control Center UpgradeMississippiDue Oct 26, 2026
- Removal of Abandoned Telecommunications EquipmentDistrict of ColumbiaDue Oct 23, 2026
- Upgrade Fire Detection System at FDC Honolulu, HawaiiHawaiiDue Oct 28, 2026
- IDIQ Joc Total Small-Business Set-Aside for Electrical and Other Wiring Installation Projects at Various Government Facilities Located Within the Marine Corps Logistics Base Barstow, Marine CoDue Oct 28, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Oct 28, 2026
- Fire Alarm Replacement IDIQVirginiaDue Oct 23, 2026