Plant City Utilities Communication Tower Generator Replacement (FEMA)
- Response deadline
- Dec 3, 2026 Due in 41 days
- Date posted
- Oct 22, 2026
- Source
- Open notice
Description
The City of Plant City is seeking a qualified contractor to replace the existing standby generator serving the municipal communication tower. This project is critical to maintaining uninterrupted communication capabilities during emergency events. The communication tower supports monitoring and control of essential utility infrastructure, including the Water Reclamation Facility (WRF), the Water Treatment Plant South (WTPS), and all lift stations located throughout the City. Reliable backup power is essential to ensure continuous operation of these systems during power outages. The selected contractor will provide and install a new generator system in accordance with project specifications and all applicable codes and standards.
Documents
No documents posted for this opportunity.
Similar contracts
- Lift Station Communication Improvement (FEMA)FLDue Nov 19, 2026
- As Needed Cured In Place Pipe (CIPP) Lining ServicesFLDue Oct 8, 2026
- WRF Sand Filtration System AirliftFLDue Aug 12, 2026
- Underground Utility Locating ServicesFLDue Aug 13, 2026