Description
LETTING LOCATION: 1074 Hwy 90 Chipley POSTING DATES: 12/03/2026 and 12/17/2026 CONTRACT DAYS: 120 CONTRACT EXECUTION DAYS: 10 SPECIAL START DATE: N/A ACQUIS./FLEXIBLE START TIME: 120 Days Flexible The Improvements under this District Contract consist of Installation of Pile Jackets with Cathodic Protection and Spall Repair on SR 20 over Basin Bayou Bridge No. 600910, in Walton County. Pre-Qualification is required to bid on this project. Marine General Liability Insurance as referenced in Section 7-13.5 of the FDOT Standard Specifications may be required if any work under this Contract is performed using vessel(s)*. Prior to the Contract execution, Contractor shall provide written certification to the Department if no vessel(s) will be used for the work. * Vessel: a watercraft or other artificial contrivance, whether motorized or non-motorized, used to perform some or all of the work, as well as any incidental work related to the project, which includes, but is not limited to, barges, dredges, mobile offshore drilling units, floating cranes, tugboats, ferries, and any watercraft used to transport construction workers, materials, or equipment at the project. Counties: WALTON Highway: 6003 Eligibility: Eligible
Documents
No documents posted for this opportunity.