Master Lift Station Motor Control Center
- Response deadline
- Sep 2, 2026 Due in 15 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
The City of Bartow, FL is seeking proposals for the provision of tools, materials, equipment, and supervision necessary to install a new Master Lift Station Motor Control Center (MCC). The project involves the de-energization and demolition of existing MCC sections, installation of new MCC sections, and associated electrical and control system work. The selected contractor will be responsible for ensuring all work is completed in accordance with the specified Florida Building Codes & Electrical Requirements/ Standards to include but limit to NEC (NFPA 70), and FDEP. Contractor will be responsible for providing post-bid shop drawings, detailed specialized technical diagrams and data sheets created after award for review and approval by the City, City selected or approved Engineer before installation. Shop drawings must be complete, accurate, and reflect the intended installation. Installation shall be inclusive of but not limited to MCC, VFDs, starters, breaker assemblies, Control wiring, Conduits, Pump power circuits, and SCADA electrical connections.
Documents
No documents posted for this opportunity.