Lake Sumter Landing Recreational Waterfront Wharf Project
- Response deadline
- Sep 23, 2026 Due in 32 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
The project consists of the demolition and lawful disposal of the existing boating facility (dock structure) and the construction of a new 12,309-square-foot floating dock system that includes a boathouse, gazebo, and concession building to support Dragon Boat activities and ferry boat tours. The project includes the architectural, structural, mechanical, electrical, and plumbing components necessary to support the open-air facility. The new boating facility shall be constructed in accordance with the engineering plans, specifications, and construction documents prepared by K2M Design. The Contractor shall provide a comprehensive pre-demolition structural inspection and condition assessment of the existing wharf, performed by a qualified Professional Engineer. The assessment shall include both above-water and underwater components within the areas affected by the proposed construction.
Documents
No documents posted for this opportunity.
Similar contracts
- Renovation of Fire Station #51FLDue Jul 30, 2026
- Temporary Housing and Apparatus Bay for Fire Station #51 - RebidFLDue Jul 16, 2026