Johnson Street Bridge Replacement and Public Utilities Relocation
- Response deadline
- Aug 20, 2026 Due in 4 days
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
The Johnson Street Bridge Replacement Project will replace the existing aging bridge over the C-10 Canal with a modern structure that improves safety, reliability, and long-term resiliency for vehicles, pedestrians, and cyclists. The project is near construction readiness following completion of regulatory coordination, and risk-reduction efforts. Construction will be performed in a constrained urban corridor with active traffic and adjacent waterways, requiring effective maintenance of traffic, environmental controls, and phased construction sequencing. A key element of the project is the relocation and protection of City-owned water and wastewater utilities that currently conflict with the proposed bridge footprint. The City intends to deliver the bridge replacement and utility relocations under a single construction contract, allowing the selected contractor to manage means and methods, minimize service interruptions, and reduce schedule and interface risk between structural and utility work. The City is seeking experienced Florida-based heavy civil and bridge contractors with demonstrated success on bridge replacements, urban utility relocations, and work over waterways. Vendors with strong coordination practices, a proactive approach to constructability, and the ability to maintain public access and utility service continuity will find this project to be a well-defined, construction-ready opportunity with a collaborative owner and clear delivery objectives. IMPORTANT: PLEASE DOWNLOAD/REVIEW THE FULL BID PACKET FROM THE "ATTACHMENTS" SECTION.
Documents
No documents posted for this opportunity.
Similar contracts
- Traffic AnalyzerFLDue Jul 9, 2026