OpenGov / Ionwave26-25
Open
Fabrication, Permitting, and Installation of Walton County Gateway Signs (6 Locations)
- Response deadline
- Oct 19, 2026 Due in 24 days
- Date posted
- Sep 24, 2026
- Source
- Open notice
Description
The Project consists of the fabrication and installation of County-approved monument-style entrance signs, removal and/or relocation of existing signage at five (5) of the six (6) locations listed in the Scope of Work and depicted in the design reference package included as Attachment C, new foundation and site preparation at SR 20 West, and all associated permitting through the Florida Department of Transportation and Walton County, including compliance with Scenic Corridor regulations along US 98. Contract Time: The contract duration is Contract Duration in Days days to substantial completion with an additional Number of Days until Punch List Completion days for punch list completion.
Documents
No documents posted for this opportunity.
Similar contracts
- Maintaining Multi-Use Path and Rights of Way: Phase 2FLDue Sep 10, 2026
- Maintaining Multi-Use Path and Rights of WayFLDue Aug 6, 2026