OpenGov / Ionwave26-P-00501
Open
Dock and Piling Foul Removal
- Response deadline
- Aug 11, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
Marjorie Park Marina fuel docks- dock (estimated 374 perimeter feet) fouling removal and piling (8) fouling removal. Julian B. Lane Riverfront Park Boathouse- dock (estimated 185 perimeter feet x 4) perimeter fouling removal on rowing docks.
Documents
No documents posted for this opportunity.
Similar contracts
- Intent to Single Source- Advanced Hydration System Tree Mats (TreeDiapers)FLDue Sep 25, 2026
- Tree-Mendous Tree Tree Diaper Watering Devices (No Substitutes)FLDue Sep 16, 2026
- xTool P2S with bundle (no substitutions)FLDue Aug 26, 2026
- Dock and Piling Foul RemovalFLDue Aug 17, 2026
- Concept2 Rowerg with standing legsFLDue Aug 17, 2026
- Jackson Height Gymnasium Floor RefinishingFLDue Aug 6, 2026