OpenGov / IonwaveRTSX-260056-DS
Open
Design and Construction Manager Services for Two Electric Charging Stations
- Response deadline
- Aug 27, 2026 Closed
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
It is the intent of the City of Gainesville to obtain a qualified firm to provide the design and construction management services for two (2) ChargePoint Express Depot Stations, one (1) ChargePoint Express Power Block, and two (2) 110-volt service outlets near the endpoints of charging station area. The charging station is located at the Regional Transit System Main Facility and is used to charge four (4) Battery Electric Buses (BEB) with plans for four (4) additional BEBs over the next two years.
Documents
No documents posted for this opportunity.
Similar contracts
- Special Inspections for Eastside Bus Transfer Facility (Rebid)FLDue Sep 10, 2026
- Commissioning Agent for Eastside Bus Transfer FacilityFLDue Jul 28, 2026
- Special Inspections for Eastside Bus Transfer FacilityFLDue Jul 29, 2026
- Construction of Eastside Bus Transfer FacilityFLDue Jul 9, 2026