OpenGov / Ionwave26-P-00430
Open
David L. Tippin Water Treatment Facility Lab Strobic Air Exhaust System Replacement with Double Wall Plenum (Bid Discount)
- Response deadline
- Sep 14, 2026 Due in 34 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
Provide and install new Strobic Air fan exhaust system and double wall plenum at the David L. Tippin Water Treatment Facility Water Quality Laboratory. Remove and properly dispose of existing equipment.
Documents
No documents posted for this opportunity.
Similar contracts
- Intent to Single Source Teledyne Instruments Inc.FLDue Aug 14, 2026
- Copper Sulfate PentahydrateFLDue Sep 9, 2026
- Intent To Single Source SernaTech Belt Press Parts From Compositech Products Mfg Inc.FLDue Aug 6, 2026
- Interior Wall Paint JobFLDue Aug 4, 2026
- Intent to Single Source Wallace and Tiernan Analyzers - Water Treatment & Controls Technology, Inc.FLDue Jul 16, 2026
- Intent to Single Source SANITAIRE Diffused Aeration Equipment and Replacement Parts - Xylem Water Solutions USA, Inc.FLDue Jul 16, 2026