Building 63 Envelope and HVAC Renovation, Coral Gables
- Response deadline
- Aug 19, 2026 Due in 4 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
The facility located at the USDA Subtropical Horticulture Research Agricultural Research Service (ARS) Station has approximately 6,000 square feet of lab and office area. The ductwork is collecting condensation and causing water damage. The HVAC system consists of one air-cooled chiller, associated pumps, and two variable air volume air handling units. The humidity in the labs was tested and determined to be higher than the acceptable range (70% or higher). A&E firm Clark Nexsen provided retro commissioning with TAB services and proposed solutions for the condensation problem, as well as designs for the renovation of the roof, HVAC, BAS, and chiller. Solicitation documents are posted below. NOTE: The drawings and specifications below are the A&E's 100% submittal to USDA-APHIS. When internal reviews are complete and returned, the A&E will finalize and send us the stamped, for-construction drawings and specs, at which point they'll be posted here.
Classifications
Documents (5)
- Attachment 4_Federal Construction Wage Rates_Miami-Dade County.txt.txt15 KBNot yet available
- Attachment 2_Drawings.pdf.pdf15.1 MBNot yet available
- Attachment 3_Specifications.pdf.pdf3.5 MBNot yet available
- Attachment 1_Statement of Work.doc.doc110 KBNot yet available
- 12639526Q0232.docx.docx78 KBNot yet available
Contacts
- james.g.roloff@usda.gov6125907603
Similar contracts
- Replace Granite Basin Water Booster Pumps & Tank Floats, Prescott NFArizonaDue Sep 14, 2026
- Building 246 HVAC Duct cleaning servicesTexasDue Aug 21, 2026
- J012--NEW | CTX Fire Sprinkler Reconfiguration for Dental ExpansionTexasDue Aug 19, 2026
- Z1DA--554-26-106 Replace DW Valves.ColoradoDue Sep 16, 2026
- BELA PMIS 349326B/BUNKHOUSE SEWERDue Aug 31, 2026
- Repair Building 510 HVACGeorgiaDue Aug 19, 2026